Home > Switches > Installation Guides > MS425 Series Installation Guide

MS425 Series Installation Guide

Models

Model number
Description
MS425-16 Layer-3 16-port 10GbE SFP+ aggregation switch with two 40GbE QSFP ports and 1 management interface, hot-swappable power supplies / fans
MS425-32 Layer-3 32-port 10GbE SFP+ aggregation switch with two 40GbE QSFP ports and 1 management interface, hot-swappable power supplies / fans

Package contents

In addition to the MS switch, the following are provided (mounting kit provided with 1U models only):

Rack Mount Kit includes:

  • US 12-24 mounting screws and cage nuts, 5 of each
  • INTL M5 mounting screws and cage nuts, 5 of each
  • INTL M6 mounting screws and cage nuts, 5 of each
  • Mounting washers

MS425-16 Series front panel

MS425-32 Series front panel

MS425 Series back panel

 

Power input The MS comes standard with US power cord. EU/UK/AU power cords may be ordered separately.

 

Ports and Status Indicators

The MS uses LEDs to inform the user of the device's status. When the device powers on, the main LED will be amber. Additional functions are described below, from left to right.

 

Item

Function

LED Status

Meaning

1 Restore N/A Restore button to clear switch IP and local configuration settings
2 Fan Orange One or more of the system fans has malfunctioned or is missing
3 Power (PSU) Orange One of the system PSUs (power supplies) has malfunctioned or is missing

Status

Orange

Switch is unable to or has not yet connected to the Meraki cloud

 

 

Flashing White

Firmware upgrade in process

 

 

White

Switch is fully operational and connected to the Meraki cloud

    Alternating Switch is booting, searching for uplink to Meraki Cloud
    Off Switch does not have power

3

Switch Port LEDs

Off

No client connected

 

 

Solid orange

10/100/1000 Mbps

 

 

Solid green

10,000 Mbps (10Gbps)

In addition, there is a RESTORE button available on the back panel.

Insert a paper clip if a restore is required.

  • A brief, momentary press: To delete a downloaded configuration and reboot.
  • Press and hold for more than 10 sec: To force the unit into a full factory restore.

Management Port

This port is designed to access the local switch configuration page only. For more information on local configuration, please see Local Configuration.

The management port can not be used as a standard switched port

The MS425 series will ship with all fans and a single power supply included, additional accessories including spare fans and power supplies can be purchased separately.

Equipment is to be used only in a restricted access location and installed/operated only by trained service personnel.

 

Bringing your Stack Online 

When connecting up your MS425 for the first time all of the ports are set as ethernet. Once the switches are online you can convert any port to a Stack port by simply selecting the option under the interface configuration as shown below:

It's recommended to bring the MS425's online using an uplink on each switch and configuring the port for Stacking prior to connecting the stack links. This will allow for config sync as well as firmware upgrades. The switches will blink a white status LED during upgrade so it should be visibly obvious that they're upgraded. When the Switch has a steady White Light it's connected and ready to continue so the stacking connections can be added.

Mounting hardware

The mounting hardware includes a rack mount rail kit for standard 1U racks. When installing the device, make sure that there is sufficient space between the rear of the rack and other obstacles to ensure adequate airflow.

You must to post a comment.
Last modified
19:25, 23 Dec 2016

Tags

This page has no custom tags.

Classifications

This page has no classifications.

Article ID

ID: 5073

Contact Support

Most questions can be answered by reviewing our documentation, but if you need more help, Cisco Meraki Support is ready to work with you.

Open a Case